CLIENT(USER) | CONTRACTOR/EPC | ITEM/MATERIAL | PROJECT NAME | YEAR |
---|---|---|---|---|
BASF | GS E&C | FLANGE,TUBE SHEET /
SA266 GR4,SA105N |
Ultrason 1 Yeosu Project |
2012 |
DAESAN MMA | HYUNDAI ENG / ETEC E&C | FLANGE, PIPE, ROUND BAR / HASTELLOY SB574 N10276 |
MMA PROJECT | 2012 |
NIOC & NIGC | PETROPARS IRAN CO. / SeAH E&T | FLANGE /SA350 LF2 CL1 | SOUTH PARS GAS FIELD | 2012 |
APMP | JG SUMMIT / FLUENTA | FLANGE /SA105N | JG SUMMIT NAPHTHA CRACKER |
2012 |
CMI | PLATE / SS400 | ARBEEL PROJECT | 2012 | |
MHI / DOOSAN HEAVY | ORIFICE /A240 TP304 | YANGJU/HAENGBOK LNG POWER PLANT GT(I.C #1,#2) |
2012 | |
HYUNDAI STEEL | JP Steel Plantech Co. / HYUNDAI ROTEM |
SEAL PLATE /SUS 304 | STEEL MARING PLANT (PHASE II) |
2012 |
SAMSUNG HEAVY IND | SeAH E&T | FLANGE, BOSS / SF440A |
AIR RESERVOIR HULL NO : H2007~2011 |
2012 |
VOGT POWER International | END PLATE / SA182 F91 , SA516-70 |
Ninemile Unit 6 CCGT PJT | 2012 | |
MHI / DOOSAN HEAVY | FLANGE / A182 F304,A105 |
POCHEON LNG POWER PLANT GT |
2012 | |
STX METAL | SeAH E&T | FLANGE /SF440A | COMPOSITE BOILER | 2012 |
SHI NINGBO shipyard |
STX / SeAH E&T | PAD FLANGE / SF440A |
HULL NO : H021 (KR CERT) |
2012 |
SEC (Saudi ElectricityCompany) |
DOOSAN HEAVY | FLANGE /A105 | YANBU 2 PROJECT | 2012 |
Small & Medium Business Administration (KOREA) |
FLANGE,TUBE SHEET, PLATE , PIPE / A240-304,A182F304 |
FUSION ROOT PJT | 2012 | |
SK ENERGY | FLANGE /A105 | PIGGING SYSTEM | 2013 | |
DESCON | ORIFFICE FLANGE / SA182 F11 |
DM.12224 | 2013 | |
KOSEP | STX Heavy IND | FLANGE / A105, A182F304 |
YOUNGHEUNG THERMAL POWER #5,6 |
2013 |
KOSEP | TUBE SHEET,FLANGE/ SA266-2,SA105 |
YOUNGHEUNG THERMAL POWER #5,6 |
2013 | |
STX Heavy IND | SeAH E&T | FLANGE, BOSS /SF440A | COMPOSITE BOILER HULL NO : D2231(NK&KR CERT) |
2013 |
STX Heavy IND | SeAH E&T | FLANGE,BOSS / SF440A |
AUXILIARY BOILER HULL NO : D2201(DNV) |
2013 |
DESCON | ORIFFICE FLANGE / SA182 F11 |
DM.12224 | 2013 | |
KOSEP | STX Heavy IND | FLANGE / A105, A182F304 |
YOUNGHEUNG THERMAL POWER #5,6 |
2013 |
KOSEP | TUBE SHEET,FLANGE/ SA266-2,SA105 |
YOUNGHEUNG THERMAL POWER #5,6 |
2013 | |
STX Heavy IND | SeAH E&T | FLANGE, BOSS / SF440A |
COMPOSITE BOILER HULL NO : D2231(NK&KR CERT) |
2013 |
STX Heavy IND | SeAH E&T | FLANGE,BOSS / SF440A |
AUXILIARY BOILER HULL NO : D2201(DNV) |
2013 |
KOMIPO | FLANGE / A105 | BORYEONG THERMAL POWER |
2013 | |
SK GAS | SK E&C | FLANGE / A105,SS400 | HBO PROJECT | 2013 |
KALTIM | FLUENTA / TOYO ENG | FLANGE / A105N | KALTIM 5 PROJECT | 2013 |
MHI / DOOSAN HEAVY | FLANGE / A105 | POCHEON LNG POWER PLANT GT |
2013 | |
KOEWP | DOOSAN HAEVY | NOZZLE&FLANGE / SUS304,SA105 | 5MW BIO GAS | 2013 |
KOWEPO | GE | FLANGE / CARBON STEEL |
TAEAN IGCC GAS PLANT | 2013 |
SAUDI ARAMCO | DAELIM | FLANGE / CARBON STEEL |
SADARA ISOCYANATES PJT |
2013 |
PETRON | DAELIM | FLANGE / SA105N | PETRON BATAAN RMP-2 |
2013 |
LG CHEM | MHI | FALNGE / SA182 F11 CL2, SA105 |
DANGJIN THEMAL POWER PLANT UNIT 9&10 |
2013 |
PT. Pertamina | GS E&C | FLANGE.NOZZLE / SA105 | RFCC PROJECT | 2013 |
KALTIM | TOYO ENG | FLANGE / CARBON STEEL | KALTIM-5 PJT | 2013 |
SKODA POWER | SK E&C | FLANGE.NOZZLE / SA105,SA182 F22 |
PACO PROJECT | 2013 |
SUMITOMO | SHI | FLANGE.NOZZLE / SA105N | SUMITOMO STEAM DRUM PJT | 2013 |
GE | FLANGE. / A105 | MALAYSIA EAST BELUMUT |
2013 | |
CFE | MHI | FLANGE / SA105,SA182 F304L |
LOS AZUFRES III PHASE I |
2013 |
KDHC | SIEMENS | FLANGE.ORIFICE / SA105,SA182 F304, SA182 F91 |
ANSAN CHPP PJT | 2013 |
SABIC & EXXONMOBIL (CEMYA) |
DAELIM | FLANGE.NOZZLE / SA105N | SAUDI ELASTOMERS PROJECT |
2013 |
KHNP | DOOSAN HAEVY | FLANGE.TUBE SHEET / A105,B171-C70600,C46400, A240-316L,A240-304 |
hanwool nuclear power plant |
2013 |
SK E&S | FLANGE / A105, A182 F304 |
COMBINED HEAT POWER PLANT |
2014 | |
PDVSA | HYUNDAI E&C | FLANGE / SA182 F11 CL2 |
RPLC-1 | 2014 |
KOSEP | STX HEAVY IND | FLANGE / A240-304, A105, SS400 |
YEONGHEUNG THERMAL POWER PLANT |
2014 |
GE | POSCO ENGINEERING | FLANGE / A240-304, A182 F11, A182 F304 |
PYEONGTAEK LNG TERMINAL PROJECT |
2014 |
KHNP | DOOSAN HAEVY | FLANGE / A105 |
HANWOOL NUCLEAR POWER PLANT |
2014 |
IRPC | GS E&C / SK E&C | FLANGE / SA105 |
UHV PROJECT | 2014 |
KOMIPO | DOOSAN HAEVY | FLANGE / A105, A182 F304, 182 F316 TUBE SHEET / B171-C63000 |
BORYEONG THERMAL POWER |
2014 |
SAUDI ARAMCO | DAELIM | FLANGE / SA182 F304 |
DADARA GAS SUPPLY PROJECT |
2014 |
SEC | HYUNDAI HAEVY | FLANGE, TUBE SHEET / SA182 F304 |
JEDDAH SOUTH TERMAL POWER PLANT PROJECT |
2014 |
RIL | POSCO PLANTEC | FLANGE / SA350 LF3 CL1 |
GASIFICATION PROJECT |
2014 |
INPEX | FLANGE / SA105 |
ICHTHY FPSO PROJECT |
2014 | |
Pune (India) | HYUNDAI E&C | FLANGE / SA105 |
2500MW CCPP | 2014 |
Takreer | SAMSUNG ENG | FLANGE, BOSS / SA350 LF2 CL1, SA105N |
CARBON BLANK & DELAYED |
2014 |
SAUDI ARAMCO | DAELIM | FLANGE / FLANGE/ |
SADARA ISOCYANATES PROJECT |
2014 |
KOSPO | STX | FLANGE / A105, A182 F304, A240-304 |
SAMCHEOK GREEN POWER |
2014 |
SEC | HYUNDAI HAEVY | FORGED BAR / A182 F304 |
JEDDAH SOUTH PROJECT |
2014 |
PGSOC | HANIL HEAVY IND | FLANGE / A105 |
BANDAR ABBAS GAS CONDEN SATE REFINER |
2014 |
Reliance Industries Ltd. | BOSS / SA105N |
Jamangar J3 expansiom |
2014 | |
Alstom (Indonesia) |
FLANGE / SA182 F11, SA182 F22 |
STG and Boiler BATUBARA Project |
2014 | |
HYUNDAI E&C | BOSS / SA105 |
LAB PJT | 2014 | |
KOSPO | STX | FLANGE / A105 |
SAMCHEOK GREEN POWER |
2014 |
Republic of Cote D’ lvoire |
KEPCO E&C | FLANGE / A182 F304, A182 F91, A182 F11 |
Ciprel IV Volet B Project |
2014 |
SAUDI ARAMCO | DAELIM | FLANGE / SA182 F304, SA182 F316, SA105 |
SADARA Isocyanates Plant Project |
2014 |
KOWEPO | DAELIM | FLANGE / A182 F304 |
Taean Power Plant | 2014 |
DAEWOO INTERNATIONAL |
POSCO PLANTEC | FLANGE / SS400 |
1,200 Pax Ferry | 2014 |
SAMSUNG HEAVY IND |
POSCO PLANTEC | FLANGE / SS400 |
Ichthys CPF Project | 2014 |
KOMIPO | DOOSAN HAEVY | FLANGE / A182 F304 |
BORYEONG THERMAL POWER |
2014 |
Jeongwoo Indstrial Machine co.,LTD |
FLANGE, Tube Sheet / A182 F304, A105, B170-C46400 |
KERI Project | 2014 | |
Singapore | HYUNDAI E&C | ORIFICE PLATE / A240-316L |
JRC1 Project | 2014 |
COLOMBIA | STX HEAVY IND | ORIFICE / DUPLEX |
TEROTASAJERO 2 161.6MW COAL FIRED POWER PLANTE(TT2) |
2014 |
EPP | SAMSUNG HEAVY IND | FLANGE, PLATE / SA105, SA516-70 |
MONT BELVIEU TX3 |
2014 |
EPP | SAMSUNG HEAVY IND | FLANGE, PLATE / SA105, SA516-70 |
MONT BELVIEU TX3 | 2014 |
LG Chem | PLATE / SA182 F91, SA182 F22 CL3,SA105 |
Daesan No.2 HRSG PROJECT | 2014 | |
KOSEP | STX Heavy Industries Co., Ltd | FLANGE / A240-304 |
YEONGHEUNG THERMAL POWER PLANT | 2014 |
Freeport | Fluor Corp | FLANGE / A105 |
LHC-9 PROJECT | 2014 |
PCIHBV | STX Heavy Industries Co., Ltd | FLANGE / SA182 F316L |
Garraf GTU PROJECTT | 2014 |
NEFT | SAMSUNG ENG | BOSS, FLANGE / SA350 LF2 CL1 |
Badra CPF Phase-II | 2014 |
KEPCO | DOOSAN HAEVY | FLANGE, PLATE / SS400, A516-70 A182 F304 |
BORYEONG THERMAL POWER | 2014 |
STX Heavy Industries Co., Ltd | FLANGE / A105, A105 GAL’V |
AMMARA PROJECT | 2014 | |
KOMIPO | FLANGE / A105 |
WONJU RDF PROJECT | 2014 | |
Uzbekistan | HYUNDAI E&C | FLANGE / SA105 |
E-KANDYM | 2014 |
RIL | POSCO PLANTEC | FLANGE / SA105 |
Jamnagar J3 expansion | 2014 |
KOWEPO | DAELIM | FLANGE / SA105 |
TAEAN Power Plant | 2014 |
Australia | SAMSUNG HEAVY IND | FLANGE / SS400 |
Ichthys CPF Project | 2014 |
KOMIPO | DOOSAN HAEVY | SHELL FLANGE / A105, A266-4, A240-316L |
BORYEONG THERMAL POWER | 2014 |
Dubai | FLANGE, ORIFICE PLATE / SA105, A516-70 |
DUBAL Feed Water System Piping | 2014 | |
FLUOR | POSCO PLANTEC | FLANGE / SA105, SA350 LF2 CL1 |
LHC-9 PROJECT | 2014 |
SOCAR | GS E&C | FLANGE / SA105N |
AEGEAN REFINERY PROJECT | 2014 |
KEPCO | DOOSAN HAEVY | FLANGE / SS400 |
BORYEONG THERMAL POWER | 2014 |
PETROFAC | S&TC | FLANGE / SA182 F51 |
ALRAR SBF | 2014 |
Daewoo International Corporation | POSCO PLANTEC | FLANGE / SS400(GAL’V) |
1,200 Pax Ferry | 2014 |
Tecnicas Reunidas, S.A | POSCO PLANTEC | BOSS / SA508-3 CL2 |
Touatgaz PROJECT | 2014 |
ALGERIA | Daewoo International | FLANGE/ A105 |
BISKRA & JIJEL PROJECT / P01411000199 | 2014 |
SAUDI ARAMCO | SAMSUNG ENG | FLANGE/ SA105 |
LUBRTF YANBU PROJECT | 2014 |
POSCO ENGINEERING | FLANGE/ SA182 F304/304L,SA182 F316/316L |
KPA IV PROJECT | 2014 | |
Congo | HYUNDAI HAEVY | FLANGE/ SA350 LF2 CL1, SA105 |
Moho nord Project | 2015 |
Petronas(Malaysia) | SAMSUNG ENG | FLANGE/ SA105N |
TGAST Project | 2015 |
BRAZIL CSP | POSCO | FLANGE/ A182 F316 |
BRAZIL CSP | 2015 |
GS Donghae Electric power | STX Heavy Industries Co., Ltd | FLANGE/ A182 F304L |
Bukpyuong thermal power |
2015 |
Sonatrach | DEAWOO ENC | FLANGE A105 | PROJECT CAFC | 2015 |
Groupement Timimoun | SAMSUNG ENG | FLANGE SA105 | TIMIMOUN PROJECT | 2015 |
EC(Energy Commission of Malaysia) | DEALIM | FLANGE A182F304 | Energy Commission of Malaysia | 2015 |
Exelo | FLANGE A105 | Wolf Hollow & COLORADO BEND | 2015 | |
POCHEON POWER | GS E&C | FLANGE A105 | POCHEON PJT | 2015 |
SPE SPA |
POSCO DAEWOO |
FLANGE A105 | BISKRA & JIJEL PROJECT | 2015 |
KOSPC | HANSOL SEENTEC | FORGED SA105 / SA182F12CL2 | SAMCHEOK GREEN POWER | 2015 |
TNB | DEALIM | FLANGE SA516-70 / SA182F304 | FAST TRACK 3A | 2015 |
DEAWOO ENC | FLANGE SA105 | CONRTAL AREA FIELD CONPLEX OIL | 2015 | |
TIMIMOON J/V | SAMSUNG ENG | FLANGE SA105, SA182F316L | TIMIMOON FIELD DEVELOPMENT | 2015 |
KSA | HANHWA E&C | FLANGE A105 | Umm Wu’al Phasphate PKG-5 MCP/DCP | 2015 |
CPC | GS E&C | FLANGE SA105N | No.11 DIESEL HDHS | 2015 |
TECHNIP FRANCE | POSCO PLANTEC | FORGED SA182F304L | YANAL LNG | 2015 |
FMC Separation System | POSCO PLANTEC | BRONZE BOSS FORGED A350LF2CL1 | SCPX PROJECT | 2015 |
GAZFROM | SAMSUNG ENG | FLANGE SA105 | BADRA OIL PROD.CPF PH-2 | 2015 |
E-GINQ | SHI | FLANGE SA182F316L | E-GINA FPSO PROJECT | 2015 |
PETRONAS | SAMSUNG ENG | FLANGE SA105 / SA182F316L | RAPID PROJECT | 2015 |
LUOC | HYUNDAI E&C | FLANGE, TUBE SHEET, CHANNEL SA105 / SA266GR4 | UKAN PROJECT | 2015 |
IRAG | GS E&C SK E&C |
TUBE SHEET A266GR4 | KARBALA REFINERY PROJECT | 2015 |
HYUNDAI E&C | FLANGE A105 | Termotasajero PROJECT | 2015 | |
KOWEPC | DEALIM | FLANGE A105 | 2015 |